Skip to content
    playerr1

    playerr1

    @playerr1
    playerr1
    playerr1
    published a Repl
    4 months ago
    0
    Monte Carlo Simulations
    Monte Carlo SimulationsThis Monte Carlo Simulation simulates two tasks which need completing before t = (userInput) . The first task takes A hours to complete, (between 1 and 5 hours), and the second task takes B hours to complete, (between 2 and 6 hours). The x-axis represents the time it takes to complete both task, and the y-axis represents the probability density.
    Copyright © 2024 Replit, Inc. All rights reserved.
    • twitter
    • tiktok
    • instagram
    • facebook

    Replit

    Programming languages

    • Python
    • JavaScript
    • TypeScript
    • Node.js
    • Nix
    • HTML, CSS, JS
    • C++
    • Golang